Terminate up to 100,000 subscribers — PPPoE, IPoE and L2TP LNS — with integrated CGNAT and a full BGP / IGP / MPLS L3VPN routing stack, on standard x86 servers.
Subscriber termination, carrier NAT and provider-edge routing on the same system — no separate boxes, no per-feature licences.
L2TP LNS for wholesale hand-offs, PPPoE access concentration, and IPoE with DHCP. A dual-stack subscriber is one session per access circuit.
RFC 2516 · RFC 2661 · TR-101 · Option 82
Shipping Explore terminationBGP with VPNv4 and VPNv6, a selectable IGP (IS-IS, OSPF, or none), MPLS L3VPN and per-service VRFs. The BNG is a first-class provider edge in your core.
MP-BGP · IS-IS / OSPF · LDP · ECMP · multi-VRF
Shipping Explore routingNAT44 with sequence-numbered port-block logging, in every licence. Translating a subscriber does not make them a second billable unit.
NAT44 · EIF · RFC 5424 port-block logs
Shipping Explore CGNATEvery claim on this site is a screen in the management portal — here, on demo data.
The management portal on demo data: 200+ live subscriber sessions across PPPoE, IPoE and L2TP LNS.
Everything below is a command you can run against the evaluation build.
| Capability | Detail | Status |
|---|---|---|
| Subscriber sessions | PPPoE, IPoE, L2TP LNS · dual-stack, one session per circuit · 100k capacity | Shipping |
| Routing | MP-BGP (VPNv4/VPNv6) · IS-IS / OSPF / none · MPLS L3VPN · ECMP · multi-VRF | Shipping |
| CGNAT | NAT44 · endpoint-independent filtering · sequence-numbered RFC 5424 port-block logs | Shipping |
| AAA | RADIUS (PAP/CHAP/MS-CHAPv2) · CoA/Disconnect (RFC 5176) · direct database driver | Shipping |
| Data plane | DPDK / AF_XDP · shared-memory state · forwards while the control plane restarts | Shipping |
| Platform | x86-64 · Debian 13 (Trixie) · standard servers, no appliance lock-in | Shipping |
No bandwidth tier, no per-core maths, no feature add-on list. Put a bigger server in and push more gigabits — the licence is the same. The bands and prices are published, not quoted on request.
See pricing bandsPlanning an ASR 1000 migration? The fixed-configuration line is on Cisco's end-of-life track — ASR1001-HX software maintenance ends July 2026, with no like-for-like successor announced. Netavo BNG is a software migration path on standard x86 servers. Migration notes →
Free evaluation up to 50 subscribers. No payment details required.
Start free evaluation Talk to an engineer